<dl id="pfffd"></dl><noframes id="pfffd">
<video id="pfffd"><ruby id="pfffd"><ins id="pfffd"></ins></ruby></video>
<menuitem id="pfffd"></menuitem><span id="pfffd"><th id="pfffd"><th id="pfffd"></th></th></span>
<listing id="pfffd"><var id="pfffd"><cite id="pfffd"></cite></var></listing>
<listing id="pfffd"><menuitem id="pfffd"><cite id="pfffd"></cite></menuitem></listing><strike id="pfffd"><ruby id="pfffd"></ruby></strike>
<address id="pfffd"><noframes id="pfffd">
<listing id="pfffd"></listing><span id="pfffd"></span><dl id="pfffd"><i id="pfffd"><ins id="pfffd"></ins></i></dl>

Hot NewsLSDP-32PPR Two-layer Double-pipe Production Line

LSDP-32PPR Two-layer Double-pipe Production Line
07-042019Prdouct News
06-192019 Industry News

【CHINAPLAS 2019 On-site Interview】Liansu:Efficient, Energy-saving, Automation and Informatization, P

【CHINAPLAS 2019 On-site Interview】Liansu:Efficient, Energy-saving, Automation and Informatization, Providing One-stop Extrusion Processing Ecological Chain
06-172019Exhibition News

『2019Chinaplas』Liansu Machinery invites you to share exhibition information

『2019Chinaplas』Liansu Machinery invites you to share exhibition information
04-292019Prdouct News

LSP-1000PVC pipe extrusion production line

The whole line is equipped with data acquisition system to store and analyze production process data, visualize production process and improve management efficiency.
04-262019Prdouct News

Double-pipe high-speed extrusion production line

The main machine is equipped with special permanent magnet servo motor for extrusion, it is energy-saving and efficient, saves more than 15% of energy.
11-132018Prdouct News

Automatic Bundling & Bagging machine for PVC Trunking

For packing 3.8 meter trunking, the packing and bagging cycle of each bundle is less than 1 minutes.The two adjacent lines can be designed and packed in the form of “face-to-face”, which is convenient for one person to operate two machines at the same time.
10-262018Prdouct News

【110MM-1200MM HDPE Water Supply Pipe Project】——Cases Sharing

The HDPE water supply pipe project with specifications ranging from 110MM to 1200MM,equipped with an efficient and energy-saving mainframe of screw L/D ratio 40 series,and unique synchronous servo control hauling system with one drive control multi motors solution , 1:100 ultra wide speed range, ensure the production stability of equipment in specifications and speed span,high yield.Using the all dust free swarfless cutting mechanism, the maximum thickness of the pipe is up to 100MM.
 1 23 >>
黄金海岸彩票官网平台